# Engineering and Product Constraints

**URL:** <https://gov.indexcoop.com/t/engineering-and-product-constraints/1679>\
**Category:** Uncategorized\
**Created:** [9 June 2021 19:55 UTC](https://gov.indexcoop.com/t/engineering-and-product-constraints/1679 "2021-06-09T19:55:45Z")\
**Posts on this page:** 1\
**Showing post:** 8

<div class="post-metadata">

**Author:** ![Thomas\_Hepner](https://yyz1.discourse-cdn.com/flex027/user_avatar/gov.indexcoop.com/thomas_hepner/32/111_2.png) [@Thomas\_Hepner](https://gov.indexcoop.com/u/Thomas_Hepner)\
**Post date:** [14 June 2021 01:03 UTC](https://gov.indexcoop.com/t/engineering-and-product-constraints/1679/8 "2021-06-14T01:03:46Z")

</div>

@puniaviision Thank for bringing these issues to the community in a very detailed and thoughtful post. I’ve been thinking it over the past few days along with @overanalyser’s [INDEX.labs](https://gov.indexcoop.com/t/index-labs-an-idea-to-consider/1712) post.

**I am going to ask some pointed questions and make some tough comments so I want to first acknowledge that I completely understand, emphathize, and agree with you that Index Coop is currently constrained by its Engineering resources.**

I want to be a part of solving these product constraints and have a lot of questions and thoughts for clarification on your post that I would love to further discuss in the Product Working Group meeting tomorrow.

**1. How can we transfer product operational responsibilities from Engineering to other teams and contributors?**

> [@puniaviision](#):
>
> Currently, the Index Coop is constrained by its engineering resources - we cannot simultaneously launch and operate new products, as well as improve existing ones.

I understand why this is the case for product like the Stable Yield Index (SYI) or Instrinsic Productivity for DPI as these require engineering/development effort.

It is very unclear to me why the Synthetix Debt Mirror (SMI) or sectoral indices like mine and Kiba’s proposal for a Data Economy Index (DATA) are constrained by Engineering resources.

- Why do we need Engineering resources to launch a sectoral index like DATA or Category Winners (CWI)?\*\*

- Is rebalancing of the TokenSets the only Engineering resource constraint for launching and maintaining DATA and CWI? What are the other Engineering constraints for sectoral indices like DPI?\*\*

- @dylan Could methodologists and the Product Working Group takeover many of these responsibilities from Set Engineering or the Engineering Working Group?

**2. Concerns about the Index Methodologist Program and the Product Launch Moratorium:**

> [@puniaviision](#):
>
> This means:
> 
> - Halting the launch of new products till we get our existing products to be more profitable, safe, and robust.

**As an Index Coop contributor, INDEX investor, and aspiring methodologist, this is both incredibly disappointing and frustrating.** With only a single external methodologist and an undefined moratorium on new product launches, **it is abundantly clear to me that the Index Methodologist Program is not working as intended.**

As an aspiring external methodologist, **I am extremely concerned that I will not be able to participate in the Methodologist Program** by building, launching, and maintaining new sectoral indices like the Data Economy Index (DATA) with the Index Cooperative.

To be clear - I am not criticizing you, Set Protocol, DeFi Pulse, or anybody else at the Index Coop. **We have a fantastic community and I want to be a part of the solution so we can start launching new products again as quickly as possible.**

**I look forward to continuing the conversation to find a solution in the PWG meeting!**

---

_[View the full topic](https://gov.indexcoop.com/t/engineering-and-product-constraints/1679)._
